PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Poured concrete slab on grade at the Monumental stairs Facing East (800x600).jpg Pouring concrete at the Main Lobby 102 (1) Facing South-East (800x600).jpg Pouring concrete at the Main Lobby 102 (2) Facing West (800x600).jpg Installed nelson studs at the 2nd floor Facing East (800x506).jpg Metal decking at Derrick -8 (Roof) Facing West (800x600).jpg Poured concrete slab on grade at the Main Lobby-Servery Room Facing East (800x600).jpg
Previous pageNext page Metal decking at Derrick -8 (Roof) Facing West (800x600)
Metal decking at Derrick -8 (Roof) Facing West (800x600)